Creative Factory
Static, GIF and video creative at volume, under templates and guard rails, with RBI checkpoints at three stages.
Vertical: ATL · Status: ⬜ Planned Back to ATL · workflows index
Trigger
From an approved draft or script - or, at page 4 volumes, from a topic queue directly.
Flow
Discovery -> Content -> [RBI] -> Creation -> [RBI]
|
Approval <- Vernac
|
[RBI]
What page 4 specifies
1) ATL -> Creative -> 15000 -> Static | GIF | Video
Creative (own)
-> Template + UGC -> under guidelines
-> Diff Approaches -> Diff Themes
-> Localization + Topicality
-> FACTORY
The 15 000 figure is the point. At that volume creative cannot be briefed individually - it has to be templated, generated, and machine-checked against guard rails.
Named partner tools: Zocket, Righton, Adobe Firefly, Canva.
Agents involved
Visual Agent (proposed) for generation and guard-rail QC - Localization Agent (proposed) for the vernac fan-out - Compliance Agent at each RBI checkpoint.
Blocked on
An image model, an asset store and a template library - three new pieces, the largest infrastructure lift in the ATL set.
Also unresolved: the three RBI checkpoints do not exist. Today there is one compliance gate, at the end, on blogs only.
Roadmap source
Page 4 - Creative (own) and FACTORY; deliverable ① on page 5 — see roadmap_ref_extracted.md.